
County Road 27 will be closed (bridge out) between County Road 8 and County Road 46 from May 17 to Aug. 13 for bridge rehabilitation. (Map ID#1)
County Road 22 will have lane restrictions in both directions between County Road 21 and Commercial Boulevard from Aug. 3 to Aug. 11 for road construction. (Map ID#2)
County Road 27 will be closed at No. 47 Drain located between County Road 23 and Highway 3 from Aug. 4 to Sept. 3, 2021 for culvert replacement. (Map ID#3)
County Road 42 will be closed at the Concession 4 Drain located between Renaud Line and County Road 25 from Aug. 16 to Sept. 10. (Map ID#4)
County Road 2 will have lane restrictions between Strong Road and Moisson Creek Bridge from July 26 to Aug. 13 for road construction. (Map ID#5)
County Road 23 will have lane restrictions between County Road 18 and County Road 27 from Aug. 12 to Aug. 27 for road construction. (Map ID#6)
County Road 18 will have lane restrictions between County Road 23 and Coulter Road from Aug. 12 to Aug. 27 for road construction. (Map ID# 7)
County Road 22 will be closed between Commercial Boulevard and County Road 19 on Sunday, Aug. 22 from 5 a.m. to 10 a.m. for road construction. (Map ID# 8)
County Road 50 will be closed at the West Townline Drain located between Wright Road and County Road 41 from Sept. 13 to Oct. 8 for culvert replacement. (Map ID# 9)
Please exercise patience with the line painting operations. Be prepared to drive slowly and do not drive over the wet paint to prevent damage to your vehicle.
Contact Us